Production process of terrazzo prefabricated slabs

发布时间:2021-12-07


   Terrazzo precast slab Production process flow

  I'm sure you've seen all kinds of Terrazzo precast slab styles, ever-changing, but can't find the right one, don't know how to choose the right one. Let me sort out the current production processes, to give everyone a clear direction of choice.

  A. This process is a relatively long-term production process, after the raw materials are well proportioned and pressed, the plates need to be solidified for a period of time. The raw materials are mostly silicate cement, combined with some domestic mining aggregate components, the product is pressed, this type of price is relatively low.

  B. This technology is a relatively mature production process, derived from artificial stone technology.

  Many raw materials are also imported from abroad, such as white cement, mining aggregates, there are many characteristics and styles, the plates are very beautiful, can be made into super large particles (3-8cm) at a moderate price.

  Of course, in some production processes, some manufacturers will also add resin components to make the color more bright and beautiful, but most are "inorganic terrazzo".

  C. Vacuum stone technology is the current new material stone production technology.

  This technology does not use glue and resin for bonding, but resin components fill the internal gaps of the plate, the amount is about 5%. According to international inspection, it still meets the inorganic material standards. The raw materials of vacuum stone are mainly composed of silicon dioxide and quartz powder.

  Its main characteristics are excellent performance, stain resistance, wear resistance, durability, acid and alkali resistance. The price is slightly more expensive than other precast plates, but much cheaper than imported artificial stone. The style variability is slightly less than the process, but the overall style type can meet the needs of the vast majority.

  D. Tile technology, I will not elaborate here. Relatively mature production technology is completely different from artificial stone production. Tile styles can be diverse, but the surface pattern is printing technology, paving grouting is done with grouting agent, can not be polished, suitable for low cost.

   Terrazzo precast slab Construction details of different processes

  Construction is an art, materials account for 30%, and work accounts for 70%. If the nodes are not well grasped during the construction process, no matter how good the materials are, they will be damaged. Next, I will briefly talk about several nodes to pay attention to during the construction process.

  Main construction requirements

  Before construction, pay attention to the treatment of the base surface, ensure that the base surface is firm, flat, no hollowing, clean, free of oil stains, release agents, floating dust, loose materials and other stains, and no structural cracks or shrinkage cracks. Before installation, Terrazzo precast slab ensure that the base surface is completely hardened.

  When laying the wall, in order to ensure the quality of the project, it is recommended to use safe and durable Type II cement adhesive (taking Ready-made cement as an example), using cement yellow sand auxiliary materials, which are cheap and easy to level, but may cause efflorescence, especially white terrazzo style, the early stage must be well prevented, you can use stone-specific back protection auxiliary materials, the cost is generally 3-5 yuan/square meter.

  After the wall is paved, there should be no water on the wall and floor. When mixing cement, prepare according to the manufacturer's product construction instructions. It is strictly forbidden to add water randomly during construction. Generally, a one-time allocation is the construction amount for half an hour.

 